top of page

Documents Required for RERA Project Registration: Complete Checklist 2025

  • Writer: Vivek Patekar
    Vivek Patekar
  • Jul 1
  • 4 min read

Successful MAHA RERA registration depends significantly on submitting complete and accurate documentation. Missing or incorrect documents are the primary cause of application delays and rejections. This comprehensive guide covers all essential documents required for seamless MAHA RERA project registration.


Category 1: Legal and Ownership Documents

Land Ownership Documents
  • Sale Deed/Title Deed: Original registered sale deed establishing clear ownership

  • 7/12 Extract: Updated revenue records from the village accountant

  • Property Card: Municipal property card or survey settlement record

  • Non-Encumbrance Certificate: For the past 30 years from Sub-Registrar office

  • Mutation Documents: Revenue department mutation records if applicable


Legal Clearance Documents
  • Legal Opinion: Advocate's legal opinion on clear and marketable title
  • Power of Attorney: If applicable, registered power of attorney documents

  • Partnership/Company Documents: MOA, AOA, partnership deed, or LLP agreement

  • Board Resolution: For companies, board resolution authorizing project registration

  • No Objection Certificates: From co-owners, legal heirs, or other stakeholders


Category 2: Regulatory Approvals and Permissions

Planning and Development Approvals
  • Commencement Certificate: Building commencement certificate from local authority

  • Approved Building Plans: Sanctioned architectural and structural drawings

  • Development Permission: DP remark or development permission from planning authority

  • Layout Approval: Approved layout plan from competent authority

  • Environmental Clearance: EC certificate if required based on project size


Infrastructure and Utility Approvals
  • Water Supply NOC: No objection certificate from water supply department

  • Drainage Approval: Sewerage and drainage connection permissions

  • Electricity Load Sanction: Electrical load sanction from electricity board

  • Fire NOC: Fire department no objection certificate

  • Access Road Approval: Road widening or access road permissions if required


Category 3: Financial and Banking Documents

Financial Capacity Documents
  • Audited Financial Statements: Last 3 years' audited financial statements

  • Income Tax Returns: ITR for past 3 years for promoter/company

  • Bank Statements: 12 months' bank statements showing financial capacity

  • CA Certificate: Chartered accountant certificate of financial capacity

  • Project Cost Estimate: Detailed project cost estimation and funding plan


Banking and Insurance Documents
  • Escrow Account Details: Designated bank account details for project funds

  • Bank Guarantee: Performance guarantee from scheduled commercial bank

  • Insurance Policies: Professional indemnity and project insurance policies

  • Loan Sanctions: Construction finance sanctions if applicable

  • Fund Flow Statement: Detailed fund flow and utilization plan


Category 4: Technical and Engineering Documents

Architectural and Structural Documents
  • Detailed Drawings: Complete architectural, structural, and MEP drawings

  • Structural Design: Structural design calculations and stability certificates

  • Soil Investigation Report: Geotechnical investigation and foundation design

  • Survey Reports: Topographical and boundary survey reports

  • 3D Visualization: Project 3D models and visualization (if available)


Compliance and Quality Documents
  • Engineer Certificates: Structural engineer and architect registration certificates

  • Quality Standards: Compliance certificates for building standards

  • Safety Measures: Construction safety and quality control plans

  • Technical Specifications: Detailed technical specifications of construction

  • Completion Timeline: Realistic project completion schedule and milestones


Category 5: Marketing and Sales Documents

Project Information Documents
  • Project Brochure: Detailed project information and amenity descriptions

  • Floor Plans: Unit-wise floor plans with carpet area calculations

  • Amenity Details: Complete list and specifications of project amenities

  • Specification Sheet: Detailed specifications of construction materials and finishes

  • Sample Sale Agreement: Draft sale/lease agreement format


Pricing and Payment Documents
  • Price List: Detailed pricing structure for different unit types

  • Payment Schedule: Proposed payment schedule linked to construction milestones

  • Additional Charges: Breakdown of additional charges and taxes

  • Refund Policy: Clear refund and cancellation policy for buyers

  • Possession Timeline: Detailed possession and handover schedule


Document Preparation Best Practices

Quality and Format Requirements
  • Clear Copies: Submit high-quality, legible copies of all documents

  • Proper Indexing: Organize documents with proper indexing and page numbers

  • Digital Format: Ensure documents are in acceptable digital formats (PDF preferred)

  • Authentication: Notarize or authenticate documents where required

  • Translation: Provide English translations for documents in regional languages


Common Documentation Mistakes to Avoid
  • Incomplete Information: Ensure all forms are completely filled without blank fields

  • Outdated Documents: Verify all documents are recent and within validity periods

  • Signature Mismatches: Ensure consistent signatures across all documents

  • Missing Attestations: Include required attestations and certifications

  • Incorrect Details: Double-check all names, dates, and numerical information


Document Verification Process

MAHA RERA Verification Stages
  1. Preliminary Check: Initial document completeness verification

  2. Legal Verification: Legal opinion and title clearance verification

  3. Technical Evaluation: Engineering and architectural document review

  4. Financial Assessment: Financial capacity and banking document verification

  5. Compliance Review: Regulatory approval and permission verification


Timeline for Document Review
  • Initial Verification: 7-10 working days for completeness check

  • Detailed Review: 15-20 working days for comprehensive evaluation

  • Query Resolution: Additional time for clarifications if required

  • Final Approval: 5-7 working days for final approval and certificate issuance


Professional Assistance for Documentation

When to Engage Experts
  • Complex Legal Issues: For properties with complicated ownership structures

  • Technical Compliance: For projects requiring specialized engineering approvals

  • Financial Structuring: For complex funding and financial arrangements

  • Regulatory Navigation: For understanding specific local authority requirements


Cost-Benefit of Professional Help

Engaging experienced MAHA RERA consultants can reduce documentation time by 50-70% and significantly improve approval success rates, making professional assistance a cost-effective investment.


Digital Documentation Strategy

Online Submission Requirements
  • Portal Compatibility: Ensure all documents are compatible with MAHA RERA online portal

  • File Size Management: Optimize file sizes for efficient upload and processing

  • Backup Strategy: Maintain backup copies of all submitted documents

  • Version Control: Track document versions and updates throughout the process


Conclusion

Proper documentation is the foundation of successful MAHA RERA registration. By following this comprehensive checklist and maintaining high documentation standards, developers can ensure smooth registration and avoid costly delays. The investment in proper documentation preparation pays dividends through faster approvals, reduced queries, and enhanced project credibility.

For expert assistance with MAHA RERA documentation and registration, our experienced team provides comprehensive support to ensure error-free submission and timely approval.

 
 
 

Recent Posts

See All

Comments


bottom of page